aausat3造句
- AAUSAT3 was launched 25 February 2013 on PSLV C20.
- AAUSAT3 is fully functioning and AIS measurements are done on a regular basis.
- After launching AAUSAT3 the fourth will begin development.
- On February 25, 2013 after one year launch delay Aalborg University did launch AAUSAT3.
- One proper crafted package was sent to AAUSAT3 and normal situation for the EPS was re established.
- May 2013 "'the power system ( EPS ) onboard AAUSAT3 rejected to handle multi frame communication packages from ground.
- "' AAUSAT3 "'is the third CubeSat built and operated by students from AIS receivers as the main payload.
- The idea was developed by a group of students from Aalborg University in 2008, and further developed for the AAUSAT3 CubeSat mission that was launched in 2013.
- During the last 24 hours battery voltage was decreasing and temperature readings did indicate that AAUSAT3 was steady pointing the sixth side without solar cells towards the sun.
- It's difficult to see aausat3 in a sentence. 用aausat3造句挺难的