Precedent for other " cda " sites resulting in adverse cumulative impacts on the existing and committed road networks and infrastructural provisions in the ho chung area ; and 结果,现有和已承诺在蚝涌地区提供的道路网络和基础设施,会受到不利的累积影响;以及
The museum was originally a hakka village developed in late 19th century . the huts , drying terrace , kitchens , pigpens , cattle sheds and a 6 - metre bell tower have been retained 坐落蚝涌河河畔,具400多年历史,供奉宋朝(公元960至1279年)一位大元帅-车公。
The eastern part is definitely a place for conservation and any further development should be concentrated in existing activities centres such as sai kung and ho chung 研究区东面肯定是供自然保育之用,而任何进一步发展应集中在现有的活动中心,例如西贡和蚝涌。
To streamline the traffic flow and encourage environmentally friendly transport , the concept of gateway centre is proposed in sai kung town and ho chung 为了减少汽车流量和鼓励使用环保的交通工具,顾问公司建议在西贡和蚝涌实施旅游门廊的概念。请参阅上文第11 . 1
The maclehose trail , which is of a total length of 100 km and starts from pak tam chung on the sai kung peninsula , passes through 8 country parks and includes some 20 hills I .在彩虹地铁站乘92号或96r号(只在假日行走)巴士或往西贡1a号1m号专线小巴于蚝涌站下车; ii
In the preliminary development strategy , ho chung is proposed as a secondary node only and no intensification for medium housing is proposed due to road capacity threshold 初步发展策略只是建议把蚝涌发展为次要枢纽。由于道路容量所限,蚝涌的发展密度不会建议增加至中等密度。
Take bus no . 94 or green minibus no . 9 at sai kung town centre and alight at pak tam chung . it costs about hk $ 50 to take a taxi to get there from sai kung town centre 在沙田市中心(新城市广场巴士总站)乘299号巴士往西贡墟总站,再转乘往彩虹地铁站1a号1m号专线小巴于蚝涌站下车。
The park - and - ride facilities at ho chung and sai kung town could also be included to enable the visitors to use environmentally friendly transport in their further trips within sai kung 顾问公司正考虑建议在蚝涌和西贡市设立泊车转乘设施,令游客在西贡区内游玩时,可以在这两个地点转乘环保的交通工具。
This is a realigned 0 . 7 - kilometre single two - lane carriageway linking the nam wai and ho chung areas to enhance the safety of motorists and the flow of traffic in the two areas ; it was substantially completed in july :一条重新定线的700米长双线不分隔车道,连接南围和蚝涌区,以提高驾驶人士的安全并改善交通流量。
Phase iii of the works in nam wai and ho chung is scheduled to start in early 1999 for completion in 2001 . improvement works to castle peak road from siu lam to so kwun tan started in february 1997 for completion in late 1999 第三期南围与蚝涌之间的西贡公路改善工程,也将于一九九九年初动工,预计在二零零一年完成。