繁體版 English
登录 注册

进度风险的英文

发音:  
"进度风险"怎么读用"进度风险"造句

英文翻译手机手机版

  • schedule risk

例句与用法

  • Construction management of hongjiadu hydropower station project
    拉西瓦水电站前期隧洞施工进度风险分析
  • In the control of construction schedule for hydropower projects , risk analysis of the schedule is a key
    工程施工进度风险分析计算是施工进度控制中的重要环节。
  • Therefore , it is of very importance to perform schedule risk analysis before the implementation of r & d project
    因此,在研发项目实施之前开展进度风险分析十分必要。
  • The computational risk of schedule is comparably small with the classical pert method , but it is effective to decide the critical path - method
    ( 3 )提出了用当量概率修正pert网络,计算进度风险的方法。
  • Thirdly , a schedule risk assessment method based on single mode stochastic resource constrained project scheduling problem model is presented
    第三,提出基于单执行模式随机资源约束项目调度问题模型的进度风险评估方法。
  • R & d projects have some characteristics such as high technology , long life cycle , and large investment scale , which results in remarkable schedule risk problem
    研发项目技术含量高、研制周期长、投资规模大,进度风险问题非常突出。
  • While , study the scheduling bayesian network to model software project scheduling risk . the modeling method , related calculation and probability inference algorithm are presented
    在进度贝叶斯网络的研究中,给出了软件项目进度风险的建模方法、模型中的相关计算以及概率推理算法。
  • After the lag procedure introduced , the precedence network is transferred into generalized pert network , and then the risk of construction schedule could be calculated with the mc method or the modified pert method
    引入时距工序后,将搭接网络转化为广义pert网络,然后用mc方法或用当量概率修正pert方法计算搭接施工网络进度风险
  • Futhermore , a scheduling pretreatment process is proposed to integrate the information of different views , thus the information of cmvqm can support two processes of schedule risk assessment and schedule risk management planning directly
    建立了调度预处理过程,使cmvqm模型中的信息能够直接支持进度风险评估与进度风险管理计划决策等过程。
  • Nowadays project risk ’ s research mainly focuses on engineering and software , to the it hardware project risk research , considering its infinite uncertainty , little related research information and methods , its risk is huge
    本文主要是针对it硬件产品项目风险的分析和研究,概括其主要的风险有:市场风险、技术风险、组织风险、进度风险、资源风险和质量风险。
  • 更多例句:  1  2
用"进度风险"造句  
进度风险的英文翻译,进度风险英文怎么说,怎么用英语翻译进度风险,进度风险的英文意思,進度風險的英文进度风险 meaning in English進度風險的英文进度风险怎么读,发音,例句,用法和解释由查查在线词典提供,版权所有违者必究。