繁體版 English
登录 注册

设计水头的英文

发音:  
"设计水头"怎么读用"设计水头"造句

英文翻译手机手机版

  • design head

例句与用法

  • Om , the electricity generated by turbine generator increased to 5 . 0 million kw , which was relatively reasonable
    如将设计水头提高到37 0米,水轮机发电机出力增容到5
  • The results showed that considering the general performance of turbine and the discharge capacity of runner hl240 - lj - 420 , when the design head was 36 . 2m , the electricity generated by turbine generator increases to 4 . 8 million kw , which was relatively reasonable
    结果表明:考虑到水轮机的综合性能和hl240thj一10流道的过流能力,在设计水头为36 2米时,水轮机发电机出力增容到4
  • ( 2 ) retrofitted the small turbine of tai pin shao hydropower station in this paper . the results indicated that given the unchanged channels of the original runner hl240 - lj - 120 and satisfied cavitation condition and stability requirement , the electricity generated by the turbine generator increased from 3000kw to 3600kw when the design head was 36 . 2m , which arrived at the expectant objective
    ( 2 )对太平哨电厂的小机进行了改造,在不改变原hl240 - lj - 120流道并满足气蚀和稳定性要求,在设计水头为36 . 2米时,水轮机发电机出力由原来的3000千瓦增容到3600万千瓦,达到了预期目标。
  • Abstract : the effect of turbine characteristic on stable sectional area of surge tank can be expressed by the synthetic characteristic coefficient of turbine , it shows the effect of turbine efficiency . based on the analysis on the variation of the characteristic curve for middle or high specific speed turbine , this paper demonstrates that the largest stable sectional area of surge tank is not dependent on the lowest water head of hydroelectric plant but the design head
    文摘:通过理论推导,研究了水轮机综合特性系数对调压室稳定断面的影响,即水轮机运行中不同工况点效率的相对变化对调压室稳定断面的影响.得出了最危险的调压室稳定断面取决于设计水头,并通过实例得到验证
  • Because of the technical complexity of the turbine for the three gorges project and on the basis of several important technical problems which have been defined in the international bidding documents for 14 generating units in the left bank power station , the owner of the project has decided another some important technical problems based on appraisal and comparison in the bid appraisal stage after the bidding documents are analyzed and the tender documents are cleared by the tenderers
    由于三峡工程水轮机技术上的复杂性和挑战性,在左岸电站14台机组国际招标文件已明确了若干重大技术问题的基础上,在机组议评标阶段,对招标文件进行分析和投标商对投标文件进行澄清说明后,经评议比选,业主又决策了几个重大技术问题,主要有:水轮机设计水头的确定,负倾角叶片水轮机的应用,两套水力设计,舍弃初期转轮,蜗壳进行水压试验等。
用"设计水头"造句  
设计水头的英文翻译,设计水头英文怎么说,怎么用英语翻译设计水头,设计水头的英文意思,設計水頭的英文设计水头 meaning in English設計水頭的英文设计水头怎么读,发音,例句,用法和解释由查查在线词典提供,版权所有违者必究。