繁體版 English FrancaisРусскийViệt
登录 注册

红水河的英文

发音:  
"红水河"怎么读"红水河"的汉语解释用"红水河"造句

英文翻译手机手机版

  • hongshui he
  • hongshui river

例句与用法

  • A model test on regulation of channel for batao shoal in hongshuihe river
    红水河坝淘滩航道整治试验研究
  • The experimental study on waterway regulation for the xialong shoal of hongshui river
    红水河峡龙滩航道整治模型试验研究
  • The author points out that the hongshui river in guangxi and its trunk stream namely beipanjiang river in now guizhou province is the real zangke waterway in han dynasty
    本文认为:今天广西的红水河及其上游主干流北盘江(在今贵州省) ,才是真正的汉之? ?水道。
  • In this dissertation , the up - to - date theory and method of construction control are researched by depending on the construction monitoring and controlling of hong - shui river long span bridge ni guang - xi province
    本论文依托广西水南公路红水河特大桥的施工监测与控制,研究最新的施工控制理论和方法。
  • Based on the field - measured data and physical model test data , hydraulic elements of the shiwutan beach in hongshui river is analyzed , and factors of hydraulic elements variation and obstacles to navigation are discussed
    摘要根据实测及物理模型试验资料,分析了红水河十五滩滩段的水力要素变化,探讨了滩段水力要素变化及产生碍航的原因。
  • Based on the characteristic analyses of shiwutan beach channel , which is dangerous , torrential , crooked and narrow , of honshui river , and according to the relevant hydrometric and topographic data , the regulation principle and measures are presented
    摘要根据水文、地形资料,在分析了红水河上集险、急、弯、窄的十五滩滩性的基础上,提出了整治原则和措施。
  • Then , this paper presents a program , which is used to analyze the construction control of modong hongshuihe arch bridge . the calculated values coincide with the measured data and closely agree with the results obtained by other references . it was thus confirmed that the stress balance d method is effective and reliable in practice
    同时依据应力平衡法的思想,编制了用于悬臂拼装拱桥施工控制的程序,采用该程序对广西来宾磨东红水河大桥进行了施工控制分析计算,经与监测数据及课题组研究成果相比较,结果表明,应力平衡法是合理与有效的。
  • The organization system is established according to the construction courses of hong - shui river long span bridge , which includes the loop of structure analysis , construction , test , forecasting , identifying , adjusting , preliminary announcement and construction . and the construction control flow process is established in this dissertation , as well as the solving programme
    文中还根据红水河特大桥的施工过程,按结构分析、施工、检测、预测、识别、调整、预告、施工的循环特点,建立了组织机构,制定了施工控制流程和解决方案,实现大桥线形和应力的检测和控制,效果良好。
  • Finally , a theoretical model of mohong hongshuihe bridge was presented . on the basis of this simple but effective model , the spatial finite element program super sap was used to analyze the plane stress of the whole structure and some key sections , which helped to know the stress distribution of the arch rib more clearly . at the same time , some meaningful results are obtained
    最后本文利用supersap有限元分析程序建立了广西来宾磨东红水河大桥实际结构的大型有限元计算模型,并对模型进行了分析计算,得出了拱肋结构的应力分布情况及应力分布规律,同时也得出了一些有益的结论。
  • In the first part , we compute the site design flood of given design frequency ( 0 . 01 % . 0 . 1 % . 0 . 2 % and 1 % ) using the design flood hydrograph . then we get the design reservoir inflow flood of the same design frequency by the resultant discharge method . according to the computing value we compare the site design flood and design reservoir inflow flood of different time interval
    本论文以广西红水河龙滩水电站为例,在第一篇中采用洪水过程线法计算了给定设计频率为0 . 01 、 0 . 1 、 0 . 2和1的坝址设计洪水,并利用合成流量法计算了相应设计频率的入库设计洪水。
用"红水河"造句  

其他语种

  • 红水河的法语:Hongshui
  • 红水河的俄语:Хуншуйхэ
  • 红水河什么意思

    红水河

    拼音:hóng shuǐ hé
    注音:ㄏㄨㄥˊ ㄕㄨㄟˇ ㄏㄜˊ

    词语解释

    • 红水河 Hóngshuǐ Hé
    • [the Hongshui River] 中国珠江干流西江上游,从贵州望谟县至广西天峨县石龙镇的河段

百科解释

红水河位于中国广西壮族自治区西北部,为西江上游的别称。其上游为南盘江,在贵州省望谟县与北盘江汇合后称为红水河,下游与柳江汇合后称黔江。
详细百科解释
红水河的英文翻译,红水河英文怎么说,怎么用英语翻译红水河,红水河的英文意思,紅水河的英文红水河 meaning in English紅水河的英文红水河怎么读,发音,例句,用法和解释由查查在线词典提供,版权所有违者必究。
英语→汉语 汉语→英语