繁體版 English
登录 注册

竣工结算的英文

发音:  
"竣工结算"怎么读用"竣工结算"造句

英文翻译手机手机版

  • final account for completed project

例句与用法

  • On management of accounts settlement for completed project
    浅析工程项目竣工结算管理
  • How to deal with the final accounts of completion for construction projects
    浅析建设项目竣工决算审计与建设工程竣工结算审核的区别
  • The existing problems and relevant strategies in developing document resources for college key subjects
    高校基建工程竣工结算存在的问题及对策
  • To examine and check the detailed list of engineering quantity , we can not only clarify mistakes and problems without delay , but also get more convenience for contract signing and finishing the accounting of engineering
    通过对工程量清单检查和复核,不但能及时澄清错误和问题,使之更加合理地报价,也给签订施工合同、竣工结算带来了很多方便。
  • The control of the engineering costs in college capital construction projects depends largely on the control and supervision of such factors as decision - making , bidding at design stage , supervising at construction stage and settlement after the construction completion
    摘要高校基建工程控制造价,要做好决策、设计阶段工程招投标、施工过程管理、工程竣工结算等几个重要环节的控制和管理。
  • In the recent several years , the work scope of the cost engineer has expanded to the whole process of the project constructing from the feasibility stage to the completion and settlement stage , and are allowed into insurance , expert testimony and other fields
    经过几年的发展,我国造价工程师业务范围扩展到从可行性研究到竣工结算的工程项目建设全过程,以及允许进入保险业和司法鉴定等其他领域。
  • Let the electricity price approved by national authorities ofevery power plant be regarded as “ 1 ” and each power plant only reports its price percentage during price competition . the electricity net dispatching departments arrange the percentages in order and purchase the lower among them in turn . this paper also analyzes why adopting it and its advantages and some attentive questions
    工程造价的控制与管理是一个动态的过程,文章对基建工程项目竣工结算存在问题进行了分析,并就工程造价控制中应注意的事项进行了分析探讨
  • The author considers as follows : ( 1 ) we should understand how to define the price of architecture products the cost of engineering and the price of engineering , we should compare the connotations of plan price , float price and market price , we should clarify how engineering cost and architecture installation engineering cost are formed and what is the difference between balance price and final accounts price ; ( 2 ) through analyzing and comparing the account bases and composing contents of enterprise individual production cost and social average production cost , analyzing from the design mechanism ' s function of auction and bid and the purpose of actualizing auction and bid , we can confirm that the foundation that the titles are weeded when judged is enterprise individual production cost , not social average production cost ; ( 3 ) the author considers there is diverge between shop drawing budget based on ration and auction and bid , carrying out bill quantity of construction works can advance the formation of cons truction - product market price , also is the outset and integrant route to close international , but though code of valuation with bill quantity of construction works has a lot of advantage to advance the form of architecture market price , we also see it has lack and it should be amended
    针对以上问题,笔者认为:应该了解建筑产品价格与工程造价、工程价格是如何界定的、比较建筑产品的计划价格、浮动价格与市场价格的含义,搞清楚工程造价的构成和建筑安装工程费用的构成以及竣工结算价格与决算价格的区别;通过分析、比较建筑产品的“社会平均生产成本”和“企业个别生产成本”的计算依据和构成内容,从招标投标的设计机制的功能和实施招投标的目的来分析,确认在评标中剔除低于成本价标书的依据是投标企业的个别生产成本,而不是社会平均生产成本;笔者认为以定额为计价依据的施工图预算方法与招标投标之间存在悖论,工程量清单计价的推行是对建筑产品市场价格形成改革的推进,也是建筑产品价格形成方式与国际接轨的开端与必经之路,但是也必须认识到虽然《建设工程工程量清单计价规范》具有推进建筑市场价格形成的诸多优势,但仍存在不足与需要完善的地方。
  • The cost engineer plays an important part in the program investment process , from the feasibility study stage , the design stage , the bidding and tendering stage , the construction stage , to the final accounting stage , the cost engineer should fix on the conceptual control purpose and measure of the program , take the step of beforehand control , in - hand control and after - hand control , in order to carry out the controlling of all the project process and direction
    造价工程师在项目投资控制中具有重要的作用,从项目可行性阶段、设计阶段和招投标阶段、施工阶段到竣工结算阶段,造价工程师负担着确定项目控制目标和措施,采取事前控制、事中控制、事后控制的手段,实现对工程项目全过程、全方位控制。这是造价工程师在项目投资管理活动中所承担的责任。
  • Application estate counterpoises initiative register should submit following document : ? one , land access belongs to a proof ; ? 2 , building permit ; ? 3 , construction permit ; ? 4 , building complete checks and accept card ; ? 5 , the book of complete settle accounts with the authorized orgnaization that appoints via municipal government ; ? 6 , complete of building design general layout , building pursues ( include monomer to build plane , establish ) of face , profile ; ? 7 , the measurement that the mechanism that register approbates orgnaization transaction of issued on - the - spot mapping result
    申请房地产权初始登记应提交下列文件: ?一、土地使用权属证实; ?二、建筑许可证; ?三、施工许可证; ?四、建筑物竣工验收证; ?五、经市政府指定的机构审定的竣工结算书; ?六、建筑设计总平面图、建筑物竣工图(包括单体建筑平面、立面、剖面图) ; ?七、登记机关认可的测量机构出具的实地测绘结果报告书。
  • 更多例句:  1  2
用"竣工结算"造句  
竣工结算的英文翻译,竣工结算英文怎么说,怎么用英语翻译竣工结算,竣工结算的英文意思,竣工結算的英文竣工结算 meaning in English竣工結算的英文竣工结算怎么读,发音,例句,用法和解释由查查在线词典提供,版权所有违者必究。