繁體版 English
登录 注册

混凝土塞的英文

发音:  
"混凝土塞"怎么读用"混凝土塞"造句

英文翻译手机手机版

  • concrete plug

例句与用法

  • A brief introduction is given to the treatment of the zeya dam foundation , principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir . as for the excavation of the sand - gravel zones , except the toe slab and its 1 / 9 bottom width down stream , the alluvial layers are excavated to the micro - weathered rocks , while the other sections remain unexcavated . regarding to the treatment of the fracture zones , concrete filling is used for the toe slabs and semi - permeable materials are used for other section . according to the construction characteristics , a filter is placed in the down stream embankment foot . to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted . as a result safety , economic benefit , convenience in construction and good performace are achieved
    简要论述泽雅水库面板堆石坝坝基处理和防渗的原则及设计要点.趾板基础和堆石体各区砂砾石基础开挖,除趾板与其下游1 / 9底宽范围以及坝脚挖除冲积层至弱风化(局部微风化)基岩外,其余部分均予以保留.断层破碎带处理,趾板部位采用混凝土塞,其它部位采用半透水料置换,并根据本工程特点在下游坝脚加设了反滤层.为提高坝基的整体性和防渗性能,对趾板进行了固结和帷幕灌浆.达到了安全、经济、便于施工的目的,运行情况良好,可为面板堆石坝的设计和研究提供参考与借鉴
  • The results indicate that the thermal stress and comprehensive stress of 6aa dam section and f6 fault concrete tuck during construction and operation are all within the allowed concrete tensive strength . the results indicate that the construction scheme of 6aa dam section and the disposal scheme of f6 fault is feasible and meet the need of dam temperature control and crack . prevention
    计算分析表明,施工期和运行期6aa坝段及f6断层混凝土塞的温度应力、综合应力均未超过该工程碾压混凝土的设计允许抗拉强度,表明6aa ,坝段的施工方案和f6断层的处理方案在温控和防裂方面是可行的。
  • In this paper , temperature field and thermal stress of baise 6aa roller compacted concrete gravity dam section are calculated and analyzed , and the distribution laws of the temperature field and the thermal stress field during construction and operation of 6aa dam section and its foundation whose top is made of f6 fault concrete tuck , are mainly studied
    本论文通过百色碾压混凝土重力坝6aa坝段温度场和温度徐变应力场的仿真计算分析,主要研究6aa坝段及基础部位f6断层混凝土塞施工期及运行期的温度场和应力场的分布规律。
  • Three - dimension finite element floating mesh method is used to calculate the temperature field and thermal stress of 6aa roller compacted concrete gravity dam section and f6 fault concrete tuck in this paper . the basic theories adopted include heat conduction theory , elastic theory and corresponding finite element calculation equation
    本文用三维有限元浮动网格法对6aa坝段及基础部位f6断层混凝土塞的施工过程进行温度场和温度应力仿真计算,计算的基本理论是热传导理论和弹性理论以及相应的有限元计算公式。
用"混凝土塞"造句  
混凝土塞的英文翻译,混凝土塞英文怎么说,怎么用英语翻译混凝土塞,混凝土塞的英文意思,混凝土塞的英文混凝土塞 meaning in English混凝土塞的英文混凝土塞怎么读,发音,例句,用法和解释由查查在线词典提供,版权所有违者必究。