施工荷载的英文
发音:
"施工荷载"怎么读用"施工荷载"造句
英文翻译手机版
- construction loads; working load
- site load
- "施工"英文翻译 be in the process of constru ...
- "荷载"英文翻译 load
- "工作荷载;施工荷载" 英文翻译 : working load
- "使用荷载;施工荷载;工作荷载" 英文翻译 : working load
- "施工和检修集中荷载" 英文翻译 : construction and examination concentrated load
- "荷载" 英文翻译 : load◇荷载电抗 load reactance; 荷载率 load rate; 荷载曲线 load curve; 荷载图 load diagram; 荷载系数 load factor
- "施工" 英文翻译 : be in the process of construction; be under construction; build; construction 市政工程施工 public works construction; 裂缝和漏水表明房子的施工质量不好。 cracks and leaks are signs of poor construction in a house. 施工重地, 闲人免进。 construction site. no admittance. 水库正在施工。 the reservoir is under construction.; 施工场所 job location; work-site; 施工单位 unit in charge of construction; 施工缝 [建筑] construction joint; 施工工程师 operating engineer; 施工管理 construction management (supervision); 施工机械 construction machinery; 施工计划 construction program; 施工面积 floor space under construction; 施工企业 construction enterprises; 施工人员 builder; constructor; 施工图 working drawing; 施工现场 fabricating yard; construction site; job location; 施工许可证 builder's licence; 施工组织 construction organization; 施工组织安排 mobilization
- "半荷载" 英文翻译 : half load; half-load
- "边荷载" 英文翻译 : side load
- "变荷载" 英文翻译 : variable load
- "冰荷载" 英文翻译 : ice loading
- "超荷载" 英文翻译 : excess load
- "次荷载" 英文翻译 : subordinate load
- "单荷载" 英文翻译 : single load
- "点荷载" 英文翻译 : point loading
- "动荷载" 英文翻译 : dynamic load; energy load; live load; traveling load
- "风荷载" 英文翻译 : wind loading
- "负荷载" 英文翻译 : negative load
- "拱荷载" 英文翻译 : arch load
- "荷载板" 英文翻译 : loading plate
- "荷载比" 英文翻译 : loading ratio
- "荷载的" 英文翻译 : laden
- "荷载点" 英文翻译 : load acting point; point of load application
- "荷载法" 英文翻译 : d―loaddd
- "荷载计" 英文翻译 : loadometer; loancell
例句与用法
- Construction loads ; working load
施工荷载 - The emulation analysis of high building by using space structure model possessing conversion layers under constructing loads
含转换层高层建筑施工荷载仿真分析 - So , the actual state of concrete filled steel tube on load is always that there is pre - stress in steel tube . these members are susceptible to the effects of pre - stress in the steel tube due to construction load
因此,就出现了在钢管和混凝土共同受荷前,空钢管就预先承受纵向压力(包括自重、施工荷载等) ,在钢管中产生了初应力。 - Finally , theory analysis was conducted about the characteristics of three common construction loads , which are loads of self - dumping truck , tire roller and vibratory roller , and mechanical calculation models were established for three loads
最后,通过对自卸式运料车、轮胎压路机和振动压路机等三种常见施工荷载特性进行理论分析,建立了三种荷载的力学计算模型。 - On basis of this , mechanical responses of pavement structures under construction loads were analyzed , taking different construction phases of an asphalt pavement and different ages of pavment material into account . the ultimate bearing capacity was analyzed according to
在此基础上,分析了不同施工阶段、路面材料不同养生龄期时,沥青路面结构在施工荷载下的力学响应,得出了路面结构在相应条件下的极限承载力,据此提出了合理的施工控制要求和建议。 - This thesis mainly researches second - prestressing precast slabs , it is important to study its one - way slab floor ' s ability in use . specific content include : imitate construction load lab , through this method to analyze the precast slabs " properties in the first stage in burden load . one - way precast slabs " lab , analyes one - way precast slabs sandwich s ability in second burden load stage
具体的研究内容有:模拟施工荷载试验,即对装配整式夹层板第一受力阶段进行研究;单向装配整体式结构的第二受力阶段的性能进行研究,并分析了二次张拉预应力筋所引起的结构的变形和应变与计算结果进行对比。 - Firstly , for the system of moulding board and support frame in construction the side pressure and screws are analyzed . the material and structure form of support frame are discussed . the design of support frame uses the method of limited state , and also it analyses the integer stability , part stability , and single stability , and then proposes the load analysis of multi - level support frame
首先,针对转换层梁模体系及支撑架施工,重点分析了转换层结构现浇混凝土对模板侧压力值及模板对拉螺杆的计算;讨论了转换层支撑体系的形式及构造,详细论述了基于极限状态设计的支撑架计算方法,包括纵横向水平杆的强度验算、立杆的整体稳定性、局部稳定性、单肢杆件稳定性等验算,并提出了多层支撑架的施工荷载计算方法。 - In staged construction process , study is primarily aimed at the truss load resistance capacity and flexural performance under construction and design load , combination performances of steel trusses in conjunction with concrete beam , the vertical displacement difference of two steel trusses with different span and their lateral stability , the glide displacement of the steel truss end during construction , the load resistance performance of steel trusses and concrete structure at the designed load , and the extreme limit loads and the breaking appearance of the combined steel trusses
主要研究了在阶段施工过程中,钢桁架在施工荷载及设计荷载下的受力性能和变形能力;钢桁架与混凝土梁板的共同工作性能;两榀不等跨钢桁架在整体受力下的竖向位移差及其对结构的作用和侧向稳定性;钢桁架端部在施工阶段的滑动情况;使用阶段钢桁架及其端部混凝土结构的受力性能;组合钢桁架结构的极限承载力和破坏形态。 - 2 . the random nature of load construction is analyzed . according to analyze various factors on change of reliability index , casting girder 、 construction live load 、 concrete intensity 、 wind load 、 construction distribution load deviation and basket falling , which influence on construction reliability of rigid frame bridge with high - pier and large - span , are obtained
2 .研究了各施工荷载的随机性,通过分析各种影响因素对可靠指标的变化程度,得到已浇梁段、施工分布活载、混凝土强度、风载和施工荷载偏差以及挂篮跌落等对高墩大跨刚构桥施工期可靠度的影响。
相关词汇
施工荷载的英文翻译,施工荷载英文怎么说,怎么用英语翻译施工荷载,施工荷载的英文意思,施工荷載的英文,施工荷载 meaning in English,施工荷載的英文,施工荷载怎么读,发音,例句,用法和解释由查查在线词典提供,版权所有违者必究。