繁體版 English
登录 注册

拱端的英文

发音:  
"拱端"怎么读用"拱端"造句

英文翻译手机手机版

  • arch abutment

例句与用法

  • ( 2 ) according to the forming model of the deep pull cracks , they can be divided into three classes pulled cracks - , pressed cracks and sheared cracks . ( 3 ) based on the two - dimensional and three - dimensional finite element methods . the following results can be affirmed : in the slope excavating process , the base surface will rebound in the direction of the excavating surface ' s excerior normal . the maximal displacements of the left and right bank are + 3 . 6cm and + 2 . 4cm ; the arch abutment will rebound in the direction of the river valley , the maximal displacements of the two bank are + 3 . 5cm and + 2 . 2cm ; the upstream and downstream surface will rebound in the direction of the normal direction . the maximal displacements are + 2 . 1cm and + 1 . 7cm . ( 4 ) the natural slope is stable
    ( 3 )通过二维及三维有限元分析得知,左右岸拱肩槽边坡在开挖过程中,开挖底面主要表现为朝开挖面外法线方向发生回弹,左右岸最大位移量分别为+ 3 . 6cm 、 + 2 . 4cm ;拱端面主要表现为向河谷方向发生侧向回弹,左右岸最大位移量分别为+ 3 . 5cm 、 + 2 . 2cm ;上下游坡面主要表现为向临空方向的回弹,左右岸最大位移量分别为+ 2 . 1cm 、 + 1 . 7cm ;开挖使岩体产生由卸荷回弹导致的倾倒拉裂现象。
  • The prestressed continuous beam - arch composite bridges are a special structural system where the horizontal thrust of the arch rib is absorbed by a prestressed tie at deck level . in some cases , this type of structure is preferable because it does n ' t have the large thrust at the spring hi traditional arch bridges and the somewhat large bending moment and shear force in traditional beam bridges . as a result , the performances of the prestressing reinforcement can be efficiently utilized
    它利用拱肋承担压力,系梁预应力束抵抗拱端推力,吊杆及纵横桥面系结构承受桥面荷载,既克服了传统拱桥巨大的拱端推力,又改善了连续梁桥较大的弯矩和剪力的受力状况,最大限度地发挥了拱梁混凝土和预应力钢筋各自的特点,经济效益显著。
用"拱端"造句  
拱端的英文翻译,拱端英文怎么说,怎么用英语翻译拱端,拱端的英文意思,拱端的英文拱端 meaning in English拱端的英文拱端怎么读,发音,例句,用法和解释由查查在线词典提供,版权所有违者必究。