工地勘测的英文
发音:
"工地勘测"怎么读用"工地勘测"造句
英文翻译手机版
- site investigation
- "工地"英文翻译 construction plant; building ...
- "勘测"英文翻译 survey; reconnaissance
- "场地勘测" 英文翻译 : site surveying; sitesurveying
- "实地勘测" 英文翻译 : field investigation; on-the-spot reconnaissance; site investigation
- "探土;土地勘测" 英文翻译 : ground investigation; groundinvestigation
- "阵地勘测" 英文翻译 : site survey
- "土地勘测;土地勘探;探土" 英文翻译 : ground investigation
- "地盘勘测;实地勘测" 英文翻译 : site investigation
- "美国地勘测研究院" 英文翻译 : us geological survey
- "土地勘测资源部长" 英文翻译 : lands survey and natural resources minister; minister of lands survey and natural resources
- "勘测" 英文翻译 : survey; reconnaissance 地质勘测 geological survey; 地形勘测 topographical survey; 勘测报告 survey report; 勘测队 survey party; 勘测图 exploration map; 勘测者 cruiser
- "工地" 英文翻译 : construction plant; building site; construction site; work site
- "场地勘察" 英文翻译 : site investigation
- "场地勘探" 英文翻译 : site exploration
- "基地勘探" 英文翻译 : site exploration
- "极地勘察员" 英文翻译 : polyarnik
- "实地勘查图" 英文翻译 : survey map
- "实地勘察" 英文翻译 : examine on the spot
- "土地勘查" 英文翻译 : reconnaissance
- "调查,勘测" 英文翻译 : survey
- "勘测;草测" 英文翻译 : reconnaissance survey
- "勘测队" 英文翻译 : field party; survey team
- "勘测艇" 英文翻译 : reconnaissance boat
- "勘测图" 英文翻译 : reconnaissance map
- "勘测者" 英文翻译 : cruiser; locator; surveyor
例句与用法
- Progress report on 72lc - prison development plan at hei ling chau feasibility study and preliminary site investigation for land formation and infrastructure works
72lc喜灵洲监狱发展计划为土地平整和基础设施工程而进行的可行性研究及初步工地勘测工作进度报告 - Supplementary information - progress report on 72lc - prison development plan at hei ling chau feasibility study and preliminary site investigation for land formation and infrastructure works
补充资料72lc喜灵洲监狱发展计划为土地平整和基础设施工程而进行的可行性研究及初步工地勘测工作进度报告 - The outcome of stage 1 feasibility study and preliminary site investigation for land formation and infrastructure works for the proposed prison development at hei ling chau the stage 1 feasibility study was approved by fc on 16 . 5 . 03 ; and
拟议的喜灵洲监狱发展计划的土地平整和基础设施工程可行性研究及初步工地勘测工作第一阶段研究的结果财务委员会在2003年5月16日批准第一阶段可行性研究的拨款申请及 - The outcome of stage 1 feasibility study and preliminary site investigation for land formation and infrastructure works for the proposed prison development at hei ling chau ( the stage 1 feasibility study was approved by fc on 16 . 5 . 03 ) ; and
拟议的喜灵洲监狱发展计划的土地平整和基础设施工程可行性研究及初步工地勘测工作第一阶段研究的结果(财务委员会在2003年5月16日批准第一阶段可行性研究的拨款申请) ;及 - Fc approved a commitment to upgrade part of 677cl , entitled " wan chai development phase ii , engineering works : consultants fees and site investigation " , to category a at an estimated cost of 111 . 1 million in mod prices ; and retain the remainder of 677cl in category b
财务委员会批准一项承担额,把677cl号工程计划的一部分提升为甲级,称为"湾仔发展计划第ii期工程:顾问费用及工地勘测"按付款当日价格计算,估计费用为1亿1 , 110万元以及把677cl号工程计划的馀下部分保留为乙级。 - Pwsc endorsed a commitment to upgrade part of 759th and 736th to category a at an estimated cost of $ 66 . 1 million and $ 87 . 7 million respectively in mod prices to employ consultants to undertake the detailed design and associated site investigation works for the proposed swc and dbl
工务小组委员会通过开立承担额,把759th及736th两项工程计划的部分项目提升为甲级;按付款当日价格计算,估计费用分别为6 , 610万元及8 , 770万元,用以委聘顾问就拟建的深港西部通道和后海湾干线进行详细设计及相关的工地勘测工作。 - Pwsc endorsed a commitment to upgrade part of 343cl , entitled " central reclamation phase iii - consultants fees and site investigation " , to category a at an estimated cost of 35 . 7 million in mod prices ; and retain the remainder of 343cl in category b , re - titled " central reclamation phase iii - engineering works "
工务小组委员会通过一项承担额,把343cl号工程计划的一部分提升为甲级,称为"中环填海计划第iii期-顾问费用及工地勘测"按付款当日价格计算,估计费用为3 , 570万元以及把343cl号工程计划的馀下部分保留为乙级,改称为"中环填海计划第iii期-工程" 。 - Fc approved a commitment to upgrade part of 439cl , entitled " wan chai development phase ii - comprehensive feasibility study and site investigation " , to category a at an estimated cost of 60 million in mod prices ; and retain the remainder of 439cl in category b
财务委员会批准一项承担额,把439cl号工程计划的一部分提升为甲级,称为"湾仔发展计划第ii期-整体可行性研究及工地勘测"按付款当日价格计算,估计费用为6 , 000万元以及把439cl号工程计划的馀下部分保留为乙级。 - Fc approved a commitment to upgrade part of 343cl , entitled " central reclamation phase iii - consultants fees and site investigation " , to category a at an estimated cost of 35 . 7 million in mod prices ; and retain the remainder of 343cl in category b , re - titled " central reclamation phase iii - engineering works "
财务委员会批准一项承担额,把343cl号工程计划的一部分提升为甲级,称为"中环填海计划第iii期-顾问费用及工地勘测"按付款当日价格计算,估计费用为3 , 570万元以及把343cl号工程计划的馀下部分保留为乙级,改称为"中环填海计划第iii期-工程" 。 - Pwsc endorsed a commitment to upgrade part of 677cl , entitled " wan chai development phase ii , engineering works : consultants fees and site investigation " , to category a at an estimated cost of 111 . 1 million in mod prices ; and retain the remainder of 677cl in category b
P工务小组委员会通过一项承担额,把677cl号工程计划的一部分提升为甲级,称为"湾仔发展计划第ii期工程:顾问费用及工地勘测"按付款当日价格计算,估计费用为1亿1 , 110万元以及把677cl号工程计划的馀下部分保留为乙级。
- 更多例句: 1 2
相关词汇
工地勘测的英文翻译,工地勘测英文怎么说,怎么用英语翻译工地勘测,工地勘测的英文意思,工地勘測的英文,工地勘测 meaning in English,工地勘測的英文,工地勘测怎么读,发音,例句,用法和解释由查查在线词典提供,版权所有违者必究。