繁體版 English
登录 注册

大开挖的英文

发音:  
"大开挖"怎么读用"大开挖"造句

英文翻译手机手机版

  • heavy excavation

例句与用法

  • West pipeline crossing heihe river is the longest crossing project by a large excavation way and the method of laying both crude oil pipeline and products pipeline in a single trench
    摘要黑河是西部管道工程采用大开挖方式穿越的距离最长的河流,原油与成品油管道采用同沟敷设方式穿越该河流。
  • We succeeded in crossing hanjing river of zhong - wu gas pipeline project , dawen river of jining branch line of west - east gas pipeline using the technique of trenching in water , controlling negative buoyancy and bottom towing without water interception
    公司采用带水大开挖成沟,控制负浮力,管道底拖法等施工工艺,在江河不断流的前提下,成功完成了忠武输气管道襄樊支线汉江穿越、西气东输冀宁支线大汶河穿越等工程。
  • Researching on the technology if reverse order is to study strains if pits , structural systems if basement , environmental surwey and underpinnings . on account of emphasizing developing methods if checking strength if pick - ets , modemizing machenes of excavation and studying methods of underpinning is put forward and is a way if controlling the quality of pickets in sites , which leads an active effect ; synthetic application if rankintheory , spatial and time effect theory to excavation tl aanalyze the state of soil force and strain is brought forward and the time effect should be considered in the zone of clay , the formation and development of soil plasticity are analyzed and the most dangerous zone to decide how to excavate and where to begin is found ; analyzing the cause of picket settlement during reverse order and the differential settlement and discussing hlw to solute it . duringh the temporary survey and the environmental warship , bringing rorward the theory of environmental vibration and analyzing the state of soil force and probability of losing stabilization of soil under the effect of environmental vibration ; analyzing the state offeree in underground concrete wall by the method of mathematics and pointing out the place of the maximum force and deformation . based on systematic illustrating the reverse order , problems about application and development of reverse order and suggestions also are expressed
    鉴于国内外的研究把重点放在大力发展工程桩的实验室承载力监测方法与设备、如何使土方开挖机械现代化及对周围建筑的临测方法上,本文提出了现场利用声波层析成像技术监测钢砼桩内部质量的方法与程序,并得出了声波层析成像技术是砼桩的动态质量检测的有效手段,这对指导施有积极、现实意义;提出了综合运用朗肯土压力理论、基坑空间和时间效应影响理论来分析逆作法施工过程中基坑边坡土体应力及应变的变化情况,指出粘土地区也应考虑时间效应,并且进一步分析了基坑边坡土体的塑性区形成和发展,找出边坡最不利的区域,以确定地下室土体的挖掘的方式和顺序,指出凭主观臆断与经验来施工是不可取的;在分析、经较逆作法与大开挖顺作法的地下室结构体系受力情况及施工顺序的不同,提出了节点处理技术;分析了逆作法施工期间桩的沉降变化原因及由此而产生的差异,并探讨了解决的方法;本文还提出了环境振动对土体边坡稳定产生影响的观点,并分析了在环境振动影响下,土体的应力状态及土休失稳破坏概率,并且还运用弹性力学知识和数学分析的方法定量地分析了地下混凝土墙受力状态,指出了被监测墙体的最大应力、应变位置。
用"大开挖"造句  
大开挖的英文翻译,大开挖英文怎么说,怎么用英语翻译大开挖,大开挖的英文意思,大開挖的英文大开挖 meaning in English大開挖的英文大开挖怎么读,发音,例句,用法和解释由查查在线词典提供,版权所有违者必究。