繁體版 English
登录 注册

发电机出力的英文

发音:  
"发电机出力"怎么读用"发电机出力"造句

英文翻译手机手机版

  • generator output

例句与用法

  • Finally , a method that can accomplish the generation rescheduling preventive control is presented
    ( 4 )提出了一种利用临界切除时间来实施发电机出力预防控制的方法。
  • Om , the electricity generated by turbine generator increased to 5 . 0 million kw , which was relatively reasonable
    如将设计水头提高到37 0米,水轮机发电机出力增容到5
  • Finally , fuzzy chance - constrained programming provides a powerful means to deal with the intractable constraints functions such as those of generation companies " output
    最后,提出将发电机出力等难以处理的不等约束转换为模糊机会约束的思路。
  • When there is active power deficiency or line overloaded , linear programming method with multi dispatching strategies is applied to adjust generator output or shed load
    当潮流计算结果出现线路过载或有功缺额时,采用线性规划方法,建立电力系统有功发电再调度算法,加入了各种优化目标策略,寻找调整发电机出力或者切负荷措施。
  • So , it ' s necessary to develop more effective cct - calculating method , which will play an important role in improving power system stability , and provide possibility in realization of online control
    因此,寻找更为有效的临界切除时间计算方法和发电机出力预防控制方法是必须的,对提高电力系统稳定性有极大的作用,也为日后在线控制的实现提供了可能性。
  • Thorough study has been done to solve the problems . a fast cct calculative method was suggested which could satisfy the precision need , the method was applied in the preventive control of the generator outputs
    本文正是着眼于上述问题,进行了大量的研究工作,提出了一种快速的能满足精度要求的临界切除时间的计算方法,并将该方法应用于发电机出力的预防控制之中。
  • The results showed that considering the general performance of turbine and the discharge capacity of runner hl240 - lj - 420 , when the design head was 36 . 2m , the electricity generated by turbine generator increases to 4 . 8 million kw , which was relatively reasonable
    结果表明:考虑到水轮机的综合性能和hl240thj一10流道的过流能力,在设计水头为36 2米时,水轮机发电机出力增容到4
  • ( 2 ) retrofitted the small turbine of tai pin shao hydropower station in this paper . the results indicated that given the unchanged channels of the original runner hl240 - lj - 120 and satisfied cavitation condition and stability requirement , the electricity generated by the turbine generator increased from 3000kw to 3600kw when the design head was 36 . 2m , which arrived at the expectant objective
    ( 2 )对太平哨电厂的小机进行了改造,在不改变原hl240 - lj - 120流道并满足气蚀和稳定性要求,在设计水头为36 . 2米时,水轮机发电机出力由原来的3000千瓦增容到3600万千瓦,达到了预期目标。
用"发电机出力"造句  
发电机出力的英文翻译,发电机出力英文怎么说,怎么用英语翻译发电机出力,发电机出力的英文意思,發電機出力的英文发电机出力 meaning in English發電機出力的英文发电机出力怎么读,发音,例句,用法和解释由查查在线词典提供,版权所有违者必究。