繁體版 English
登录 注册

初凝时间的英文

发音:  
"初凝时间"怎么读用"初凝时间"造句

英文翻译手机手机版

  • initial setting time
  • period of initial
  • presetting time
  • time of final setting
  • time of initial setting

例句与用法

  • Initial setting time
    初凝时间
  • In the study , a new kind inorganic anchoring material was developed , which consisted of special binder and aggregate , the former is made from clinker , blast furnace slag and compound admixture , and the later is superfine sand . effects of the factors such as clinker / slag , binder / sand , solution / binder and constituent of solution on the strength , set - time and contraction of the matrix made from the anchoring material were studied
    上述分析研究得出以下结论:新型无机锚固材料具有早强、快硬、高强特点, 10h .抗压强度可达26 . 5mpa , 365天强度可达144 . 0mpa ;初凝时间在40min . 3h .之间,且初终凝时间差在15分钟以内;在保湿条件下具有微膨胀性,膨胀率在0 . 5 %以内。
  • Abstract : the cause of underwater concrete reinforcing cage up - floating accident is improper operation , such as loose - placement of reinforcing cage , fast - drawing of conduct pipe , improper embedded depth of conduct pipe ; and the poor quality of concrete , for example , the slump , sand percentage , adhesiveness and initial setting time don " t meet requirement
    文摘:水下混凝土浇注钢筋笼上浮事故的原因是操作不当,如钢筋笼固定不牢、提升导管过猛、导管埋深不当等,以及混凝土品质差,如坍落度、含砂率、粘聚性、初凝时间等不合要求。
  • The cause of underwater concrete reinforcing cage up - floating accident is improper operation , such as loose - placement of reinforcing cage , fast - drawing of conduct pipe , improper embedded depth of conduct pipe ; and the poor quality of concrete , for example , the slump , sand percentage , adhesiveness and initial setting time don " t meet requirement
    水下混凝土浇注钢筋笼上浮事故的原因是操作不当,如钢筋笼固定不牢、提升导管过猛、导管埋深不当等,以及混凝土品质差,如坍落度、含砂率、粘聚性、初凝时间等不合要求。
  • In order to study the direct relation between oil - base drilling fluid performance and cement job quality , a new developed evaluation method ( artificial core method ) was adopted ; the effects of the oil - base drilling fluid system and its main components on the shear cementing strengths of the first and second interfaces in cementing operation were investigated ; and those of the different mix slurry ratios on the gel strength , initial set time , final set time of slurry and the compressive strength of bond cement were examined too
    摘要为了研究油基钻井液性能和固井质量之间的直接关系,采用新建立的评价方法人工岩心法,考察了油基钻井液体系及其主要组分对固井作业中第一、第二界面剪切胶结强度的影响规律,以及不同混浆比例下对水泥浆胶凝强度、初凝时间、终凝时间和水泥石抗压强度的影响规律。
用"初凝时间"造句  
初凝时间的英文翻译,初凝时间英文怎么说,怎么用英语翻译初凝时间,初凝时间的英文意思,初凝時間的英文初凝时间 meaning in English初凝時間的英文初凝时间怎么读,发音,例句,用法和解释由查查在线词典提供,版权所有违者必究。