分包单位的英文
发音:
"分包单位"怎么读用"分包单位"造句
英文翻译手机版
- subcontractor
- "分"英文翻译 component
- "位"英文翻译 place; location
- "再分包单位" 英文翻译 : sub-subcontractor
- "二包商, 二包单位, 分包商" 英文翻译 : sub-contractor
- "承包单位" 英文翻译 : contract unit; contracting agency; contractor; tenderer
- "二包单位" 英文翻译 : subcontractor
- "发包单位" 英文翻译 : unit of issuing contracts to
- "三包单位" 英文翻译 : sub-subcontractor
- "工程承包单位" 英文翻译 : construction company; engineering contractor
- "建筑承包单位会计" 英文翻译 : accounting of construction contractors
- "建筑承包单位审计" 英文翻译 : audit of construction contractors
- "主承包商, 主承包单位, 总包" 英文翻译 : main contractor
- "分包" 英文翻译 : subpackage◇分包办法 subcontracting arrangement; 分包出去 job out; 分包合同 subcontract; 分包人 subcontractor; 分包任务 farm-out; 分包散剂 chartula (pl.chartulae); 分包市场 jobber market
- "承包单" 英文翻译 : covering note
- "打包单" 英文翻译 : packing list packing sheet packing note packing ship
- "外包单" 英文翻译 : subsontract order
- "装包单" 英文翻译 : packing list
- "丝包单线" 英文翻译 : copper winding wires with silk coveringsingle wire with silk coveringng
- "分包人" 英文翻译 : subcontractor
- "分包肉" 英文翻译 : meat pack
- "分包商" 英文翻译 : parties to the contract; subcontractor
- "分包销" 英文翻译 : sub-underwrite; sub-underwriting
- "分包者" 英文翻译 : sub contractor; subconractor; subcontractor
- "分包制" 英文翻译 : partial contract
- "分组,分包" 英文翻译 : packetization
例句与用法
- A sub - contractor is prohibited from further sub - contracting its contracted work
禁止分包单位将其承包的工程再分包。 - The overall contractors and subcontractors shall bear joint responsibilities to project owners for the subcontracted projects
总承包单位和分包单位就分包工程对建设单位承担连带责任。 - Subcontractors shall hold themselves responsible to the overall contractor and be subject to the administration of the overall contractor concerning safe operation at construction sites
分包单位向总承包单位负责,服从总承包单位对施工现场的安全生产管理。 - The overall contracting units shall be held responsible to project owners in accordance with the provisions of the overall contracts ; the subcontractors shall be held responsible to the overall contractors in accordance with the terms of the subcontracting contracts
建筑工程总承包单位按照总承包合同的约定对建设单位负责;分包单位按照分包合同的约定对总承包单位负责。 - Considering the joining of subcontracting system , the quality , progress , cost , security of the project are controlled and decided by subcontracting to a great extent and the importance of the constructing of information and contract management , we suggest to build an agile organization from the aspects of quality , cost , controlling of operation , building of information and contract management
由于分包体系的加入,工程的质量、进度、成本控制很大程度决定于分包单位,同时信息系统建设,合同管理也更加重要,因此,从质量、成本、进度的控制和信息系统建设、合同管理方面,提出了敏捷型组织实施的建议。 - The real estate development cost control methods are specified of decision , design , execution stage to reduce the construction cost , and it is compiling feasibility study report and capital invest estimation in decision , optimizing the design scheme and designed rationally in the technique and construction drawing design stage , electing rational construction scheme in construction stage , controlling the change in the work and field visas strictly , examining and approving budge detailed , budge planning use the quantities list , electing the best subcontractor , preventing some monopoly raise the price , collecting the detailed data in the fieldwork , making strict bargain
讨论了房地产开发项目的决策阶段、设计阶段、实施阶段分别需要采取的相关措施和方法,以尽量降低项目的工程造价,即在决策阶段编写详细的可行性研究报告和编制投资估算;在设计阶段优化设计方案,进行合理的技术设计和施工图设计;在实施阶段选择合理的施工方案,严格控制工程变更和现场签证,严格审核工程施工图预算,工程造价的预算采用工程量清单报价,择优确定专业分包单位,防止少数垄断性行业任意抬价,深入现场,收集和掌握施工有关资料,制定严密的合同条款。
相关词汇
分包单位的英文翻译,分包单位英文怎么说,怎么用英语翻译分包单位,分包单位的英文意思,分包單位的英文,分包单位 meaning in English,分包單位的英文,分包单位怎么读,发音,例句,用法和解释由查查在线词典提供,版权所有违者必究。