繁體版 English
登录 注册

关水的英文

发音:  
"关水"怎么读用"关水"造句

英文翻译手机手机版

  • sekimizu

例句与用法

  • When submitted for approval according to the procedures set by the state for capital construction , the feasibility study report of the construction project should include the flood impact assessment report having been examined and approved by the relevant water conservancy administrative department
    建设项目可行性研究报告按照国家规定的基本建设程序报请批准时,应当附具有关水行政主管部门审查批准的洪水影响评价报告。
  • When the feasibility study report for flood control works or other hydraulic works and hydropower stat ions stipulated in the preceding paragraph is submitted for approval pursuant to the procedures set by the state for capital construction , a consent document for planning issued by the relevant water conservancy administrative department which conforms to the requirements of flood control planning should be enclosed as an appendix
    前款规定的防洪工程和其他水工程、水电站的可行性研究报告按照国家规定的基本建设程序报请批准时,应当附具有关水行政主管部门签署的符合防洪规划要求的规划同意书。
用"关水"造句  
关水的英文翻译,关水英文怎么说,怎么用英语翻译关水,关水的英文意思,關水的英文关水 meaning in English關水的英文关水怎么读,发音,例句,用法和解释由查查在线词典提供,版权所有违者必究。