21 " subcontractor ' s equipment " means all tools , apparatus , machinery , vehicles , facilities and other things required for the execution of the subcontract works but does not include materials or plant "分包商的设备"指分包工程施工所需的所有工具,设备,机械,车辆,设施和其它物品,但不包括材料或成套设备。
3 authenticity of subcontract works the subcontractor shall warrant and be liable that supervision , labor , materials , plant and subcontractor ' s equipment are bona fide and fit for purpose 分包工程可靠性分包商应保证其管理人员,劳工,材料,成套设备和分包商的设备均为正当的,并适合其目的,并为此承担责任。
5 indemnification the subcontractor undertakes to indemnify the contractor for all fees , impost and other charges in respect of the subcontract works , if and whenever required of the contractor by the authority 偿还主管部门要求总包商就分包工程承担的所有规费,税款和其它收费,均应由分包商承担偿还总包商。
With strong technical strength , advanced equipment , excellent personnel , and consummate after - sale services system , our company integrates developing , producing , selling and services as a whole 上海大才印包工程机械有限公司是集科研、制造、销售、服务于一体,拥有雄厚的技术力量、先进的生产设备、高素质员工和完善的服务体系的企业。
3 statutory obligations of the employer the subcontractor shall , for the employer , prepare and manage notices and applications in respect of the subcontract works , if and whenever those may jurisdictionally be required of the employer , promptly properly , and diligently 业主的法定义务对于分包工程中可能要求业主负责的通知和申请,分包商应及时,适当和勤勉地替总包商准备和管理。
2 statutory obligations of the contractor the subcontractor shall , for the contractor , prepare and manage notices and applications in respect of the subcontract works , if and whenever those may jurisdictionally be required of the contractor , promptly properly , and diligently 总包商的法定义务对于分包工程中可能要求总包商负责的通知和申请,分包商应及时,适当和勤勉地替总包商准备和管理。
Since many detailed projects have been specified to be subcontract projects by party a , thus our company specially aims at constituting the operation measures for linking of contracted projects so as to regulate the handover , takeover and simultaneous construction of projects 由于多项分项工程为甲方指定分包工程,所以我公司专门制定发包工程衔接点的处理措施,以规范工程的交接和同步施工。
Main purpose : this position is responsible for all the activities related to piping from concept to successful commissioning of the project involving basic & detail engineering procurement and sourcing of materials delivery of materials timely quality construction safety and commissioning 主要目的:该职位负责所有与外包工程顺利完成相关的管道工程包括基本和具体的施工原料的采购和配送按时高质的建设安全和委托建造
The subcontractor ' s representative shall be , without prejudice to contractor ' s instructions , continuously posted on and be resident within 15 km of the site from the commencement date until the subcontract works , pursuant to sub - clause 8 . 2 , are taken over by the contractor 在不损害总包商的指示的前提下,分包商代表应从开工日期至分包工程根据副条款8 . 2由总包商接管时为止,长驻现场,并居住在离现场15公里之内的地方。