On construction and demolition waste management , mr lo noted that nearly all the 550 000 cubic metres of tunnel spoil from this contract will be reused in the penny bay reclamation project or processed into aggregates at a local quarry 至于建筑和拆卸废料管理方面,卢耀桢指出南湾隧道挖掘工程所产生的五十五万立方米物料,差不多全部都不会浪费,并会在竹篙湾填海工程项目中循环再用,或在本地石矿场加工制成碎石,以供建筑工程使用。
The results indicate that the smaller the cash - flow eight caned by controlling minority shareholder or the lower the roa of the under layer firm or the worse the protection of investors , the more severely the tunneling to outside shareholder 结果表明:在保证控制权的情况下,控制性少数股东所持有的现金流权越小,其隧道挖掘越严重;处于金字塔底层的公司资产利润率越低,控制性少数股东越倾向于对其进行隧道挖掘;投资者保护越差,越有利于控制性少数股东的隧道挖掘。