9 when there is some air in water heater , it will affect the water temperature , please release gas from decontamination devices and radiator 9当过水热内有空气时,将影响出水温度,请通过除污器放气或散热器放气口放气
An independent specialist laboratory is employed to ensure that the decontamination works carried out by the contractor were up to the required standards 委聘独立的专业化验所,以确保承建商进行的除污工作符合规定的标准。
3 in order to prevent the liquid solid blockage internal sheet , decontamination devices or 20 mesh strainer should be installed at the entrance 3为了防止液体中的异物堵塞板材内部,应在入口处安装除污器或20网眼以上的过滤网
Recent examples of successful application of the eiao include the kowloon - canton railway corporation s lok ma chau spur line project , and land decontamination at the old kai tak airport site 环境影响评估条例的近期成功例子包括九广铁路落马洲支线项目和启德机场旧址的土地除污工程。
Manufactures and distributes analytical instruments and reagents for water testing and water quality analysis , including portable systems test strips , etc . , laboratory instruments , and process analyzers -制造水处理成套设备,包括格栅除污机系统曝气充氧系统滗水器系列和沉砂池除砂设备等。
Meguiar ' s cleaner polishes are formulated to very gently abrade the surface with meguiar ' s diminishing abrasivetm and buffered abrasivetm technology to remove the finest defects and create a perfectly smooth , high gloss finish 它是用美光的超微缩研磨剂和研磨抛光机技术在漆面上的轻轻磨擦来去除污物和创造理想的光滑、高度光亮效果的。
10 the permit holder shall submit to the director for approval , at a time to be specified by the director , detailed plans for site closure assessment and post remediation monitoring for the decontamination works 许可证持有人须在署长指定的一个时间内,向署长提交有关除污工程的工地封闭评估和实施补救工作后进行监察的详细计划,以待批准。
The principles and influencing factors of pollutant removal from wastewater in constructed wetlands were discussed , and problems existed with constructed wetlands as well as corresponding measures against these problems were also described 摘要论述了人工湿地技术的除污机理和影响因素,并介绍了目前该技术所存在的问题,同时针对问题提出了相应的解决方法。
13 before commencement of the decommissioning work , the permit holder shall deposit with the director 5 copies of the waste management plan as set out in section 8 . 4 and table 8 . 6 in the eia report to avoid or minimize potential impacts associated with waste arising 11项所提述的除污工程所需监察之外,许可证持有人须按环评报告第10章所概述以及与环评报告一并提交的独立环境监察和审核手册所详载,实施一项环境监察和审核计划。
4 before starting the decontamination works using the sve / as system , the permit holder shall submit to the eia sub - committee of the advisory council on the environment , a report containing the results of the pilot test on the effectiveness of the sve / as system 在利用土壤蒸气抽取法空气分布法系统进行除污工程前,许可证持有人须向环境谘询委员会环评小组委员会提交一份阐述测试土壤蒸气抽取法空气分布法系统成效的小型试验性测试结果的报告。