A study on estimation of non - normal process capability indices using the first four moments of data 基于矩法的非正态过程能力指数估算方法的研究
Pre - testing evaluation for social function dimensionality newly added in the work ability index questionnaire 工作能力指数法新增社会功能维度预试验评价
The calculating method of the process capability index for non - normal distribution by pearson system of distributions 利用皮尔逊分布族计算非正态分布工序能力指数
A process capability index based on the proportion of conformanceand the estimation of its lower confidence limit 一种基于产出合格率的过程能力指数及其置信下限的估计
The six sigma black belt should demonstrate an awareness of the assumptions that underlie the use of capability indices 6西格玛黑带应示范应用过程能力指数的基本假设的注意事项。
This includes computing and interpreting capability indices , estimating the % failures , control limit calculations , etc 包括计算和解释过程能力指数、估计故障百分率、控制限计算等。
The key points in cpk analysis for modern electronic industry are summarized and the suitable calculating method is discussed 总结了电子工业生产中工艺参数的典型特点,并讨论了工序能力指数的正确计算方法。
The capacity index could be analysed and measured by basic management and technology , informationization level , and the existing form of cooperation 合作能力指数可以从基础管理与技术实力、信息化程度、现有合作形式等三个层面进行分析与度量。
Traditional quality management considered that it was not availed to improve the economic benefits of the enterprises in spite of too high or too low process capability indices ( pcis ) 摘要传统的质量管理观认为,过高或过低的过程能力指数都不利于企业经济效益的提高。
At the same time , this system feedback no longer is enterprise process capability in traditional six sigma level , but is that sigma which this enterprise produces most tallies the level 同时,该系统的反馈不再是传统的六西格玛条件下企业的工序能力指数,而是该企业生产最符合的那个西格玛水平。