繁體版 English
登录 注册

工作制

"工作制"的翻译和解释

例句与用法

  • But in a world where half of all law school graduates are women - and where most women eventually become mothers - law firms that insist on more than 60 hours a week end up alienating a big part of the workforce
    但在这个世上,在所有法学院有一半女毕业生,而大多数女生最终都会成为母亲的情况下,律师事务所所坚持的每周超过60小时的工作制最终是在侵害很大一部分人。
  • People serious realized the problem that whether it wasted time to sleep , just when gaslight replaced candle , electric light did for gas light , and nightmare became daylight , 24 hour inverse - class work made the production double
    只是在煤气灯代替蜡烛,电灯又代替了煤矿气灯,黑夜变成了白昼并通过24小时倒班工作制而使产量加倍,人们才开始认真考虑睡眠是否是浪费时间这个问题。
  • According to the requirements of propeller aerocraft model test in wind tunnel , specifications of the driven motor is presented by aerodynamic analysis , and a short - term operated high power density three - phase induction motor is developed with reasonably designing the motor , such as electromagnetism load , heat checkout and high - efficiency heat exchanger
    摘要针对螺旋桨飞机模型带动力风洞实验要求,通过气动性能分析提出驱动电机的技术指标,在满足结构约束的条件下,通过合理设计电机的电磁负荷、校核发热、采用高效冷却装置等,研制出短时工作制高功率密度三相异步电机。
  • Because of working property or the limitation that produce a characteristic , cannot implement standard man - hour system , need executes the enterprise of the duty when adventitious and integrated computation duty , should deal with examine and approve formalities , newspaper proprietor of an enterprise is in charge of sectional examine and verify , labor ensures service approval
    因工作性质或生产特点的限制,不能实行标准工时制度的,需要实行不定时工作制和综合计算工作制的企业,应办理审批手续,报企业主管部门审核,劳动保障行政部门批准。
  • And it investigates the appearance condition ( including joint , crack , eroding , corrosion , braking pole device rupture , crane - girder ' s gnawing railway and so on ) of the whole crane - girder system on the spot , at the same time , it also actually examines the stress of the beam , chemical ingredient , distortion and railway excursion , etc . through sampling , and based on the actually examined results , it checks and calculates the carrying capacity of crane - girder system . then , based on the investigating on the spot and the calculated result , it discusses the mechanism of fatigue failure of the upper part of welded steel crane - girder , analyses the reason of steel crane - girder in the high - frequency emerging the fatigue crack , institutes the strengthened method of damaged steel crane - girder of accurate packing up workshop of the primary mill plant . finally , it presents some advice and suggestions for the repairing and strengthening method of fatigue crack of upper part of steel crane - girder in the high - frequency
    针对包钢初轧厂精整车间钢吊车梁上部区域出现裂缝这一问题,本文首先综述了国内外关于焊接钢吊车梁上部区域疲劳裂缝的研究现状;其次对整个吊车梁系统的外观情况(包括连接、裂缝、腐蚀、锈蚀、制动杆件断裂、吊车啃轨等)进行了现场调查,抽样实测了梁的应力、化学成分、变形及轨道偏移等,根据实测结果,对吊车梁系统的承载能力进行了验算;然后,根据现场调查及计算结果,探讨了焊接钢吊车梁上部区域疲劳破坏的机理,分析了重级工作制钢吊车梁出现疲劳裂缝的原因,制定了初轧厂精整车间破损钢吊车梁的加固方案;最后就重级工作制钢吊车梁上部区域出现疲劳裂缝的修复与加固方案提出了一些意见和建议。
  • Steel crane - girder is one of important members in industrial workshop , but in recent years , it finds that the damage of steel crane - girder in the high - frequency is very popular by the investigation of the use of workshop , and especially the phenomenon of the upper part emerging fatigue crack is more serious
    钢吊车梁是工业厂房中的重要构件之一。但是,近年来在对厂房的使用调查中发现,重级工作制下的钢吊车梁的破损比较普遍,特别是上部区域出现疲劳裂缝的现象较严重。
  • If servantchoose a person for a job the unit limitation because of working property or manufacturing characteristic , cannot implement standard man - hour system , the duty when can executing adventitious is spent or the other job such as duty of integrated computation man - hour is mixed rest method , but the arrangement of relevant working hours must sign up for director branch examine and verify , after mechanism , institution is examined and approve by human affairs bureau , carry out , after by labor safeguard branch is examined and approve , company unit is carried out
    若用人单位因工作性质或生产特点的限制,不能实行标准工时制度的,可以实行不定时工作制度或综合计算工时工作制等其他工作和休息办法,但相关工作时间的安排必须报主管部门审核,机关、事业单位由人事局审批后执行,企业单位由劳动保障部门审批后执行。
  • According to original labor department " of the duty when executing adventitious about the enterprise and duty of integrated computation man - hour examine and approve method " the 5th regulation , what duty of integrated computation man - hour uses is with week , day , season , year wait to be calculated integratedly for cycle working hours , but its are average day of working hours and average zhou gong make time answer basic and as identical as legal standard working hours
    依据原劳动部《关于企业实行不定时工作制和综合计算工时工作制的审批办法》第5条的规定,综合计算工时工作制采用的是以周、日、季、年等为周期综合计算工作时间,但其平均日工作时间和平均周工作时间应与法定标准工作时间基本相同。
  • In addition to , the fatigue crack between web and upper flange of welded steel crane beam on heavy duty service was discussed , and based on long - term observation and research , the author classified fatigue crack into bearing type and middle type crack along the horizontal direction . the causation , distributive law and mechanism of the crack were analyzed , and the precautions to take and the measures to remedy crack were presented . the main defacts including damage , crack , erosion and aging in structures , especially in concrete structure were introduced ; the defact mechanism was analyzed and the precautions to take were also given
    另外,作者对重级工作制焊接钢吊车梁腹板与上翼缘连接焊缝的纵向水平疲劳裂缝进行了长期的观察和研究,根据疲劳裂缝产生的不同机理,将其分为支点裂缝和肋间裂缝,并讨论了两类裂缝产生的原因、分布规律、机理以及防治的措施;对工程中经常遇到的结构构件,尤其混凝土构件的几种主要病害(损伤、裂缝、腐蚀与老化)进行了机理分析并提出了防治措施。
  • Join the company worker of computational man - hour duty to executing put together , workaday as it happens is on the weekend of playday , belong to regular job ; execute the worker of the duty when adventitious via approval , the day that does not get labor law provision lengthens working hours standard and month to extend the restriction of working hours standard , but unit of choose and employ persons should use flexibility to work and rest appropriately working hours means , ensure the worker rests of job of off right and production , job finish
    对实行综合计算工时工作制的企业职工,工作日正好是周末休息日的,属于正常工作;经批准实行不定时工作制的职工,不受劳动法规定的日延长工作时间标准和月延长工作时间标准的限制,但用人单位应采用弹性工作时间等适当的工作和休息方式,确保职工休息休假权利和生产、工作任务的完成。
  • 更多例句:  1  2  3  4  5
用"工作制"造句  
英语→汉语 汉语→英语