The three lysimeters constructed at king s park are built of brick and surfaced in cement plaster with short grass turfed on top 设于京士柏的三个蒸散量测定装置用砖建成,表面再涂以水泥。
These indices are updated using the upper - air observations made twice daily at the king s park meteorological station 两项指数均根据京士柏气象站每日进行两次的高空观测数据而定时作出更新的。
Great george street between paterson street and gloucester road ; ( 4 ) paterson street between kingston street and great george street ; and (四)介乎京士顿街与纪利佐治街的一段百德新街;以及
Measurement of evaporation from a water surface commenced at king s park in 1957 . daily observations have been made since then 在京士柏每日量度水面蒸发量的工作始于一九五七年,一直维持到现在。
Measurement of evaporation from a water surface commenced at king s park in 1957 . daily observations have been made since then 在京士柏每日量度水面蒸发量的工作始于一九五七年,一直维持到现在。
Potential evapotranspiration : measurements of potential evapotranspiration are made for three turfed plots at king s park . global solar radiation 太阳总辐射:太阳总辐射量是在京士柏气象站量度的。
The three lysimeters constructed at king s park are built of brick and surfaced in cement plaster with short grass turfed on top 设于京士柏的三个蒸散量测定装置用砖建成,表面再涂以水泥。上面种满短草。
The whole of kingston street and inner gloucester road will remain open for vehicular traffic from northbound tai hang road flyover until 8 pm 晚上八时前,沿大坑道天桥北行的车辆可行经京士顿街及内告士打道。
All data were recorded at the hong kong observatory except sunshine duration which was recorded at king s park and winds at waglan island 除日照及风分别在京士柏气象站及横澜岛记录外,其他数据均在天文台录得。
The plb stand for route no . 25 on paterson street outside pearl city mansion will be relocated to the southern kerbside lane of kingston street (二)位于百德新街珠城大厦外的二十五号小巴站将迁往京士顿街南行线。