A dead-weight tester is shown in fig. 8 . 静重试验器如图8所示。
The studies may indicate that an earthfill dam with a center concrete gravity overflow spillway section is the most economical, in a wide flat valley . 方案表明,在宽阔而平坦的河谷内,一种在中间段设置混凝土重试溢洪道的土坝是最经济的。
Loading test of accommodation ladder ( pilot ladder ) 舷梯(引水员梯)压重试验。
The initial wait time for a retry is a few seconds 重试的初始等待时间只有几秒。
Quit the protected - mode software and try again 退出保护模式的软件,然后重试。
Interval , in seconds , to wait between retries 两次重试之间的等待间隔(秒) 。
The full - text gatherer will retry the row later 全文收集器稍后将重试该行。
Running test and loading test for 4t provision crane 4吨食物吊运转试验和吊重试验。
Queueing system with general operation and vacation time 1重试可修排队系统
The name of the host could not be resolved 无法解析主机名。请稍后重试。