  • The purpose of engineering project control system decision is to obtain an optimum method . to evaluate a project schedule should consider comprehensively the technology and economic indexes , which conclude time , cost and resources . however , it is not reached in theory and in practice
    工程项目控制系统决策以网络计划的优化为依据寻求最优方案,衡量一项计划方案的优劣,应该综合评价它的技术经济指标,包括工期、成本、资源消耗等,但是目前还没有一个能全面反映这些指标的综合数学模型用以作为评价最优计划方案的依据。
  • At the same time , a new decision - making method which determines the indices weight on the basis of the subjective preference and objective information entropy with the strict least square method as a tool is provided in the process of mcdm . with the development of worldwide shipping market , all kinds of special ship types and corresponding ship form evaluate alternatives are emerging . the traditional ( gb11697 - 89 ) method is only suitable for common ship types and it is not suitable for ocean floating structure system evaluation either
    传统的国标法( gb11697一89 )只能对散货船、集装箱船、干货和杂货船、多用途船、油船和滚装船等普通船型进行方案评价,也不能用于海洋工程中浮式结构物的系统论证,故采用gb11697一89针对上述特殊船型进行船型方案论证和技术经济指标评价显然已不能满足实际工作需求和未来船型发展方向。
  • ( 3 ) through theoretic analyzing and with aid of practical design results , the author have researched for the first time inland the relationship between design speed of hspgs line and its economical indexes such as the traffic demand , engineering cost , operating expense , the cost for train - set purchasing and operating revenue
    ( 3 )在国内首次系统地通过理论研究和总结实际定线资料,研究了高速铁路速度目标值与其客运需求、工程投资、机车车辆购置费、运营支出等技术经济指标的量化关系。
  • In combination with project example of the application of microporous aeration and carrousel 2000 oxidation ditch process in a municipal sewage treatment plant , the advantages and disadvantages of the process flow compared with others were described ; the basic principle of degrading organic substance and removing phosphorous and nitrogen by means of the process flow was analyzed ; the main design parameters and economic and technical indices for various structures were put forward
    结合某城市污水处理厂采用微孔曝气、卡鲁塞尔- 2000型氧化沟工艺的工程实例,阐述了该工艺流程相对于其它工艺流程的优、缺点;分析了该工艺流程降解有机物及除磷、脱氮的基本原理;并提出了该工艺流程中各构筑物的主要设计参数及技术经济指标
  • There are series of excavation shapes experiment and full - field explosion experiment based on the excavation shapes experiment . the pentagon excavation , diamond excavation and spiral excavation are applied in the sandrock tunnel excavation . the analysis of experimental data and the results of experiment proved that the three excavation are apt to use in sandrock tunnel excavation , and the result of explosion is very well and the explosion rate is up to 90 %
    对于砂岩巷道进行了五星掏槽、菱形掏槽、螺旋掏槽,通过爆破实验数据和爆破结果分析,得到了在砂岩中采用上述三种掏槽形式爆破效果良好,爆破率相对较高;同时,上述三种掏槽方式及其它技术经济指标,如爆出实体岩石体积等也较好,爆破效率达到90 %以上。
  • By experimental analyzing the optimal rangers of vm ( 0 . 45 0 . 60m / s ) , vs ( 0 . 60 0 . 99m / s ) and ( 40 50 ) were determined for the harvesting equipment . technical economic indexof comp up to higherlevel . this essay not only is regarded as an important referential value for design of sunken - plant harvesting equipment , but also establishes a theoretical foundation for design subject of sunken - plant harvestingequipment
    通过实验分析,建立了以整机消耗功率为目标的数学模型,对vm 、 vs及进行了优化设计,当切割架入水角在40o 50o时,机组工作速度在0 . 45 0 . 6m / s时,输送链线速度在0 . 60 0 . 99m / s时,整机的技术经济指标达到较高水平。
  • This paper introduces the measurement methods and results of cdq - boiler system for mass and energy balance diagnosis , analyses the technologic economic index at the different product rate , puts forward the measures of decreasing the ratio of coke burning , improving the heat transfer conditions and realizing the optimized control aftertime
    摘要介绍了宝钢三期干熄炉锅炉系统质能诊断方案及其测试结果,分析了不同生产率下的主要技术经济指标,提出了今后进一步降低焦炭烧损率,改善炉内传热和实现优化控制的技术措施。
  • Concerning the load features of urban mad lighting , this article illuminates separately concentrated compensation method for capacitors in the main lines of road lighting and respective compensation for capacitors set for every single street lamp , focusing on the economical and technical evaluation and concrete method for concentrated compensation
    摘要针对城市道路照明的负荷特点,分别阐述了对路灯干线的电容器集中补偿方法和对单个路灯的电容器单灯补偿方法,并对集中补偿的技术经济指标及补偿方案进行了重点分析。
  • In the base of information collection , discourse study handling technology in yangshan container terminal of the first phase . at one time . reference waigaoqiao and ningbo container terminal " s handling technologys compare the characteristic of handling technology , and analyse the index of the technology and the economy between rail - mounted transfer crane and rubber - tyred gantry crane . discourse is carved up four part . namely task analyse of handling technology design > project study out > size design s technology and economy argumentation , commendable project confirm
    同时,借鉴外高桥、宁波北仑等的集装箱码头装卸工艺设计,着重比较分析轮胎式龙门吊和轨道式龙门吊各自的装卸工艺特点和技术经济指标。全文共分四个部分,即装卸工艺设计的任务分析、方案拟定、规模设计以及技术经济论证和推荐方案的确定。
  • According to the basic economy evaluates theories and general engineering project and technique method , on the base of systematic analysis the profession characteristics of real estate , this paper researched the economic index system and technique of the real estate investment project , presents the technique and economy evaluate index system of the sale type real estate investment project , and establish the economy analyze model of the sale type real estate investment project by using the computer technique . this paper analyze and evaluate the technique and economy index of harbin minsheng square real estate investment project in the end and draw the conclusion of the project is viable
    本文根据一般工程项目技术经济评价基本理论和方法,在系统分析房地产投资项目相关行业特点的基础上,对房地产投资项目技术经济指标体系,技术方案进行了研究,提出了销售型房地产投资项目技术经济评价指标体系,并运用计算机技术,建立销售型房地产投资项目经济分析电子模型,并且对哈市民生小区房地产开发项目进行了投资分析和技术经济评价,得出该方案可行的结论。