繁體版 English
登录 注册

新建工程

"新建工程"的翻译和解释

例句与用法

  • The structure of the arch net floor is not only light but also cheap . it can be used either in new - built projects or rebuilt works . now it has had practical applications in several projects in jilin province and has shown its higher social and economic benefits
    拱网消力池具有优异的水力特性和消能防冲效果,而且拱网结构轻便、投资少,既可用于新建工程,又可用于改建工程,经吉林省几个工程的实际应用,已显示出它所具有的较高的社会效益和经济效益。
  • Anchor jacked pile is a new technique researched by ourselves for building reinforce and has some strongpoint others have not . twenty years " popularization makes this technique widely used . now anchor jacked pile can be applied in some other project such as correction , ground strengthening , pile foundation ' s top - down construction in newly built building
    锚杆静压桩作为我国自行研制的一种地基托换加固新技术,有着其它施工方法所不具有的自身的优点,经过二十年的推广使用,目前在很多地区已经广泛使用,而且其适用范围也从以前的单一的托换加固作用发展成可用于纠偏、补强加固、新建工程逆作法桩基施工等工程。
  • Compared with other dampers , vdw has its specific advantages such as the full utilization of space , the provision of larger damping force , the convenience of installation , and the low cost of maintenance and so on . vdw not only can be applied in the earthquake - reduction design of new buildings , but also be used in the aseismatic retrofitting of existing buildings
    与其它阻尼器相比,粘滞阻尼墙可充分利用墙体所提供的空间,产生足够大的阻尼力;既适合新建工程的减振设计,又能用于现有结构的抗震加固,且安装方便、维护成本低,是目前较为理想的阻尼消能元件。
  • Answer : ( 1 ) build perfect and aseismatic take precautions against natural calamities to guarantee a system ; ( 2 ) make and carry out an enterprise program of aseismatic take precautions against natural calamities and lash - up countermeasure ; ( 3 ) had done seriously build a project the aseismatic consolidate of aseismatic fortify and original project and equipment works ; ( 4 ) the conduct propaganda of knowledge of aseismatic take precautions against natural calamities mixes aggrandizement gain ground
    答: ( 1 )建立健全抗震防灾保障体系; ( 2 )制定并实施企业抗震防灾规划和应急对策; ( 3 )认真做好新建工程抗震设防和原有工程及设备的抗震加固工作; ( 4 )强化抗震防灾知识的宣传和普及。
  • However , the mechanics mechanism is very complicated because of the difference of the size of newly - built structure , position between newly - built structure and existing structure , stratum condition , healthiness degree of existing structure , construction methods of new structure , etc . so the urgent affairs is study of the complexity mechanics mechanism and corresponding countermeasure
    然而,由于新建工程规模大小、新旧之间的位置关系、地质条件、既有结构物健全度和新建工程施工方法等不同导致其影响程度也不同,其间零零种种的受力机理是极其复杂的。因此,研究其复杂的受力机理和相应对策已成为当务之急。
  • This text aim at the measure and control ' s system at the experiment to equip of the air condition function and combination shanghai chijiang technology develop company new set up the enthalpy different laboratory , makes use of the visual basic 6 . 0 developped the measureand control ' s system of the enthalpy different laboratory . this system adopts n ow programmable control technique that spread of boundary of domestic and international work control , the regulating speed technique by changing frequency and the rs - 485 / rs - 232 technique
    本文就针对空调性能实验装置中的测控系统并结合上海弛疆科技发展公司的焓差室新建工程,利用visualbasic6 . 0开发了焓差室的计算机测控系统,该系统采用了目前国内外工控界流行的可编程控制技术、变频调速技术和rs - 485 rs - 232通信网络技术,是一套完善的管控一体化系统。
  • 更多例句:  1  2  3
用"新建工程"造句  
英语→汉语 汉语→英语