繁體版 English
登录 注册

施工任务

"施工任务"的翻译和解释

例句与用法

  • For a specific project , the construction cost of the project can be reasonably and scientifically analyzed and estimated by means of the reasonable planning for the resources allocation adaptable to the project made through the economic assessment on the conduction process ; by which the cost control indexes can be determined , the relevant internal checking mechanism and the budget system for construction cost control can be established , and then the avoidable measures for possible economic risk can be made as well , so as to obtain the benefit indexes adaptable to all the specific items to realize the management of the construction cost control for the whole construction process and build up the scientific and reasonable system of economic responsibility for making a basis for completing the project with better quality effectively , economically and reasonably
    摘要通过项目的过程经济评佑,制定出适应工程项目的合理资源配置计划,对具体工程项目的施工成本进行合理、科学的分析判断,确定成本控制指标,建立施工成本控制内部考核机制和工程施工成本预算制度,找出具体子项的经济风险源所在,建立相应的经济风险规避措施,获取适应每个具体项目的利润指标,实现工程项目施工全过程的施工成本控制管理并建立科学合理的经济责任制,以便调动项目部所有施工人员的创造性和主动性,为最终高效、经济合理、保质保量地完成工程施工任务奠定基础。
  • 更多例句:  1  2
用"施工任务"造句  
英语→汉语 汉语→英语